Toronto, Ontario, Canada, February 8, 2026: Opening day of the Line 5 Eglinton Crosstown LRT. After 15 years of construction, the 19 km, 25-station, east-west transit line finally opened on this day to the public. Hoodie #866755976
This timeless hoodie is a must-have in any wardrobe. It features a pre-shrunk fleece knit, an air jet yarn to provide a softer feel and reduce pilling, a double-lined hood with a color-matched drawcord, and a large pouch pocket. This solid-colored hoodie is made of 50% pre-shrunk cotton and 50% polyester.