Digging road before install Pipe Water. Excavation water drainage at construction site. Digging roads to lay pipes 8 inches. The road repair and caution with blocked barrier over concrete digging. Hoodie #408201574
This timeless hoodie is a must-have in any wardrobe. It features a pre-shrunk fleece knit, an air jet yarn to provide a softer feel and reduce pilling, a double-lined hood with a color-matched drawcord, and a large pouch pocket. This solid-colored hoodie is made of 50% pre-shrunk cotton and 50% polyester.