Digging road before install Pipe Water. Excavation water drainage at construction site. Digging roads to lay pipes 8 inches. The road repair and caution with blocked barrier over concrete digging. Longsleeve T-shirt #408201574
If you need a timeless long-sleeved t-shirt, this soft long-sleeved crew shirt is the one for you. It has a 100% combed ringspun cotton, 32 singles thread weight, 4.3 oz. fabric weight, a set-in 1x1 baby rib collar and a tear away label.